The Drilling Footage of the 11 Team of ZPEC Exceeded 20,000 Meters

2020-11-02

At 12 o'clock in the morning on October 23rd, Well FNHW4034, constructed by Drilling Team 11, reached a depth of 3,676 meters, exceeding the Team’s 20,000 meter annual progressive footage. They became the first drilling team to set a construction record of 20,000 meters in the Mahu Block in 2020.

 

Since the beginning of 2020, Team 11 has implemented a strong work plan, implemented scientific well drilling, and strengthened technological breakthroughs to ensure safe, stable, efficient, and orderly drilling operations. During the special period of fighting against the epidemic, they resolutely implemented the national, group, and drilling company's epidemic prevention requirements.  By carefully deploying them to achieve the special epidemic prevention and drilling construction production, they became the benchmark team for first-line production in 2020.

This year, Team 11 actively organized and carried out the educational theme of "Don't forget the original heart, keep the mission in mind", further unifying the thinking and building consensus on the team, while creatively grasping the implementation of various tasks. The excellent results of well drilling and quick drilling have won the favor of oilfield companies time and time again. Under the leadership of the team, all employees of Drilling Team 11 explained their determination and confidence to "not be only one, be the first" with practical actions.

copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1