603619
Stock code
(%)
During Spring Festival the reporter went to ZPEC Heze branch for an interview. What a bustling scene at No. 1 CNG gas filling station! There was no time at all for the staff to rest, as it was all work!
In past Spring Festival holidays, because some stations lacked personnel and the gas source was inadequate, the filling of buses and taxis in Heze city could be challenging. This year, to make sure there would be an adequate supply of gas during Spring Festival, Heze prepared in advance, repaired equipment, and added one set of CNG skid-mounted compressors. As for the gas source, the head of Heze branch led a group to search all suppliers throughout the area. This resulted in renting 4 heavy duty CNG transport trucks with 6 drivers running 24 hours non-stop. These advance preparations ensured an adequate supply.
Seeing the waiting line of taxies outside the station, one employee told the reporter while working, “At this biggest festival of China, we should fill the cars for the drivers as soon as possible. Customer satisfaction is our service aim. The work is hard, but we had an enriched day”.
“Facing the new situation and new problem, the only thing we can do is to work in a down-to-earth manner, strengthening management and pressuring ourselves to perform better. This way we shall win the first opportunity and the initiative to guarantee a good start of work in 2010, laying a firm foundation for the completion of each task of the whole year”, said Manager Liguo Zhao.
copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1