ZPEC Rig 38 Sets New Record for Shortest Drilling Period in Tenge Oilfield Kazakhstan

2024-07-29



At 7:00 pm on July 20th, with the geological completion of the Drilling Command, Well 513, drilled by ZPEC Rig 38 in Kazakhstan’s Tenge Oilfield, was completed in 17.08 days, breaking the 18.33-day record in the oilfield this year. The record was 7.82 days ahead of the average 24.9-day drilling period in the same block.


Since the beginning of this year, ZPEC Rig 38 has drilled a total of 7 wells and handed over 7 wells. This ranks first among the 4 drilling teams in the Tenge Oilfield and has become the true leader of the Tenge Drilling Project.

(ZPEC PETRO Company, Zhao Qingtao)"



copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1