603619
Stock code
(%)
At 10:00am on July 12th Iraq time,EBSZ-4 was spud in by ZPEC Rig23. It was first mobilized on June 26th with the rig up and derrick successfully completed on July 4th,reaching the level of drilling in a very fast mobilization of only 16 days. Despite the hot weather and harsh environment,everyone gave full play to the spirit of the ZPEC "Iron Army", fightingcontinuously, and reaching the level of the first section of the well withinthe given required time.
copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1