Rig 16 Lifting Completed in Iraq

2019-03-08

 

At 14:36 on March 4, Iraq local time, with the efforts from all of the staff of ZPEC’s Rig 16, a “steel giant” stood up in the desert in northeastern Iraq.  PPLA’s drilling supervisor fully affirmed the team’s “safe, efficient, and collaborative” work and overall quality of the rig lifting operation in Block 8.

 

copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1