ZPEC Rig15 Breaks 30,000 Meters Footage Mark

2017-11-23

At 23 o'clock on November 15th, ZPEC rig 15 reached 30,000 meters footage and became the first rig who have done this in the Wushenqi block.(Reported by Li Qin)

copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1