ZPEC Rig16 Carry out Electrical Safety Inspection

2017-11-10

In the early November Iraq local time, in accordance with the requirements of the project department and Party A, ZPEC rig 16 take precautions to carry out safety inspections to eliminate electrical hazards for the safe production of the rainy season.(Reported by Yang Qian)

copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1