GAZPROM P11 Well Successfully Completed

2017-10-23

On October 21th, ZPEC Drilling Team 19 successfully finished GAZPROM P11 Well in Basra. After two days, the well has already entered into the oil production stage. This is ZPEC’s 12th finished well in Basra Oilfield.

 

With the advantage of ZPEC’s Integrated Drilling Services, ZPEC team members have successfully accomplished their scheduled tasks, while saving client costs during the operation and creating better benefits for the ZPEC Group. (Reported by Hao Donglei)

 

copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1