Successful Perforation of Gazprom Project P18 Well

2017-08-15

On the evening of July 26th Baghdad local time, the perforation job of Well P18, drilled by ZPEC Drilling Team 26, came to a successful conclusion. The perforation rate of 100% demonstrated again the excellent performance of the team and reflects the strength of ZPEC. (Reported bu Wang Zhiqin)

 

copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1