The President Li Inspecting Kunlun Works

2009-04-09

On April 4, ZPEC president Li went ZPEC subsidiary - Kunlun for inspection of 2 sets 50JD drilling rigs manufacturing, meanwhile, he gave the working guide of 2009 to Kunlun company.

ZPEC general engineer Wang, vice president Shi and Gu accompanied with Mr Li to firstly check the production site. Mr. Li pointed out that is not the best time for 50JD rig, but the delivery time must be in time. At the same time, Mr. Li also supervised electrical control workshop and closely discussed with site workers.

On the day, Mr. Li held a departments managers meeting, he emphasized that although the world economy is being influenced by financial crisis, the group should closely connect with each other, and utilized group company advantages to avoid risks. After the that, the meeting point was turning to technology design area.

 

copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1