603619
Stock code
(%)
From February to April 14th, ZPEC Drilling had completed 4 wells, was in process of drilling another 2 wells, the drilling depth was up to 10,000 meters, which was 26 days earlier than last year. This established another new ZPEC Drilling record. Particularly on April 7th, drilling team 13 drilled 985 meters per day while setting a new record.
Meanwhile, the recorded drilling speed of other teams is also faster, thus showing that ZPEC Drilling’s Technology Innovation Policy is headed in the right direction. This year, ZPEC drilling teams gradually adopted “Four-in-One” drilling tools combined with a solid-free fluid system and logging while drilling. The drilling speed was improved dramatically.
copyright © 2021 中曼石油天然气集团股份有限公司 . ALL RIGHTS RESERVED 沪ICP备08116516号-1