From September 25th ,ZJ40J rig which is manufactured by KPEM will be delivered to Dingbian of Shaanxi province by three group, It is estimated that the entire goods will arrive at destination before National Day. Group President Li went to delivering site when he inspected and instructed work at KPEM, he encouraged staff do their duty, to ensure no mistake in delivering work.
The ZJ40J rig is teem with full spirit of KPEC staff which is rebuilt from Da Ding 130 rig, company arranged plan carefully at confirming of rebuilt project, designing of drawing, delivering locale and transportation, the performance of production would raised so much by using advanced technology. This project accomplished favorably is successful breakthrough of our company in old rig rebuilt area.(He Donglei)