At 12:00 of February 25, as the start of rotary table, ZPEC Drilling Team 2 drilled the first footage of ZPEC International in 2016, becoming the first spud-in crew at Changqing Oilfield No. 2 Oil Extraction Plant.
Ren Hanjun, General Manager of ZPEC International, together with 7 persons including experts and staff from the technical department, safety department and equipment department, attended the spud-in ceremony, inspected the preparation before spud-in and held a on-site meeting. Mr. Ren gave a report about the situation and work target this year. He required ZPEC Drilling Team 2 to cherish the good repuation of ZPEC at Changqing Oilfield and drill the first well in 2016 with high standards and strict requirements. (ZPEC International, Li Dongren)